STANDARD PACKAGE
| CONSTRUCTION MATERIAL ANALYSIS TABLE | ||||
| UNIT PRICE: from 950,000 VND/m² | ||||
| No. | WORK DESCRIPTION | DETAILS | MATERIALS | NOTES |
| A | BASIC CONSTRUCTION COMPONENTS | |||
| I | FOUNDATION | |||
| 1 | Earth excavation | Excavation by machinery | ||
| 2 | Foundation and beam concrete lining | Concrete with 40×60/10×20 stones, M100 | Ha Tien cement Dong Nai/District 8 stones |
|
| 3 | Rebar fabrication and installation | Steel D6-D16 | Viet Nhat/Pomina | |
| 4 | Foundation and beam concrete | Commercial concrete with 10×20 stones, M250 | Mekong/The Gioi Nha | Volume <4m³, manual concrete pouring |
| II | FLOOR | |||
| 1 | Floor leveling | Leveling by machinery | Sand fill + debris | Floor leveling height <100mm |
| 2 | Compacting 0x4 graded stone floor | Compacting K95 floor by machinery | Dong Nai/District 8 stones | Floor leveling height <100mm |
| 3 | Spreading PVC tarp | Preventing water loss in concrete | 3mm thick black tarp | |
| 4 | Floor concrete | Commercial concrete with 10×20 stones, 100mm thick, M250, no rebar | Mekong/The Gioi Nha | |
| 5 | Floor smoothing without coloring | |||
| 6 | Cutting joints, watering for floor concrete curing | |||
| III | WALLS | |||
| 1 | Building 100mm thick hollow brick walls | 8x8x18 hollow bricks, 100mm thick, M75 mortar | Binh Duong Tuynel | Walls built 1m–1.2m high from floor level |
| 2 | Plastering hollow brick walls | 1.5cm thick plastering, M75 mortar | Ha Tien cement Local plastering sand |
|
| 3 | Putty and finishing paint | 1 primer coat, 2 finishing coats | Viet My putty/Nippon paint | |
| B | STEEL STRUCTURE COMPONENTS | |||
| I | COLUMNS | |||
| 1 | Galvanized steel box columns | 100*100*2.0 box/pipe D114 | Hoa Phat/equivalent | Column height <5m |
| 2 | Steel structure oil painting | 1 anti-rust coat, 2 finishing color coats | Nippon/Bach Tuyet paint | |
| 3 | Auxiliary materials | Bolts, connection plates, welding rods, etc. | Vietnam | |
| II | TRUSSES | |||
| 1 | Galvanized steel box trusses | 500*100*1.4/40*80*1.4 galvanized box | Hoa Phat/equivalent | |
| 2 | Steel structure oil painting | 1 primer coat, 2 finishing coats | ||
| 3 | Auxiliary materials | Bolts, connection plates, welding rods, etc. | Vietnam | |
| III | ROOF | |||
| 1 | Roof purlins | 40*80*1.4 box/C120*20 galvanized | Hoa Phat/equivalent | |
| 2 | Roof sheeting | 5-wave colored sheet, 0.45mm thick | Hoa Sen/Dong A | |
| 3 | Roof trim | Colored sheet, 600mm wide, 0.45mm thick | Hoa Sen/Dong A | |
| 4 | Roof drainage system | 600mm wide sheet gutter, PVC D114 drain pipe | Binh Minh | |
| 5 | Auxiliary materials | Connection brackets, screws, etc. | ||
| IV | WALL PANELS | |||
| 1 | Wall purlins | 40*80*1.4 box/C120*20 galvanized | Hoa Phat/equivalent | |
| 2 | Wall sheeting | 5-wave colored sheet, 0.45mm thick | Hoa Sen/Dong A | |
| 3 | Roof trim | Colored sheet, 600mm wide, 0.45mm thick | Hoa Sen/Dong A | |
| 4 | Auxiliary materials | Connection brackets, screws, etc. | Binh Minh | |