7 Golden Standard Steps in the Industrial Factory Construction Process at Thinh Phat

Industrial factories serve as a solid foundation for all production activities. It is crucial to follow a standardized construction process to ensure quality, schedule adherence, and construction safety. In this article, Thinh Phat Construction proudly presents 7 golden standard steps in the process of building an industrial factory. Let’s explore them together!

Step 1: Site Preparation

This critical stage determines the smooth execution and quality of all subsequent construction phases. Key tasks include:

  • Topographic and Geotechnical Survey
    Engineers assess slope, elevation, drainage, and existing structures (if any). Soil bearing capacity, groundwater level, and unfavorable geological conditions are also examined to determine suitable foundation design and necessary ground treatment measures.
  • Land Clearing and Leveling
    Based on design drawings and survey data, land is excavated and filled to achieve the correct elevation. Precise use of bulldozers, excavators, and compactors ensures surface stability and prevents future settlement.
  • Construction Axis Layout
    Axes for columns, walls, and structural elements are marked using stakes, string lines, or modern total stations. An accurate layout prevents misalignment during structure assembly.
  • Material & Equipment Mobilization
    Timely delivery and organized storage of steel, concrete, roofing sheets, finishing materials, and machinery (cranes, mixers, welding machines…) support a continuous and efficient construction process.
  • Safety Fence and Signage Installation
    Perimeter fencing, safety signage, and protective gear for workers are implemented to ensure site safety for personnel and the surrounding areas.
  • Bước 1: Chuẩn bị mặt bằng thi công

Step 2: Foundation Construction

The foundation supports the entire structural load and transfers it to the ground. Precision in this stage is vital for long-term durability. Key activities include:

  • Excavation of Foundation Pits
    Excavate to the specified depth and dimensions without affecting nearby structures.
  • Blinding Concrete Pouring
    Apply a thin concrete layer to create a clean and level base for reinforcement and footing.
  • Reinforcement Installation
    Rebars are fabricated and placed according to design specs, maintaining correct spacing and concrete cover. All splices follow standard practices.
  • Concrete Pouring for Footings
    Concrete is poured continuously, using internal vibrators to eliminate air pockets and ensure compaction, especially at corners and intersections.
  • Concrete Curing
    Curing with water or protective covering is performed to achieve the designed strength, depending on cement type and weather.
Bước 2: Thi công móng

Step 3: Steel Structure Erection

This is a pivotal phase in pre-engineered building (PEB) construction. It involves:

  • Fabrication at the Factory
    Components are fabricated off-site with cutting, drilling, welding, surface treatment, and painting.
  • Transportation to Site
    Steel components are delivered per schedule, ensuring safety and integrity.
  • Column Installation
    Steel columns are lifted and fixed at pre-marked positions using cranes, then braced temporarily.
  • Beam & Truss Assembly
    After stabilizing columns, beams, and trusses are installed, following the approved erection sequence.
  • Bracing System Installation
    Wall, roof, and cross bracings are installed to enhance lateral stability and wind resistance.
  • Inspection & Acceptance
    Structure alignment, deflection, joint quality, and overall stability are thoroughly inspected before proceeding to the next phase.
Bước 3: Thi công kết cấu thép

Step 4: Roofing and Cladding Installation

Once the frame is in place, roofing and cladding are installed to enclose the structure:

  • Purlin Installation
    Roof and wall purlins are installed to support sheeting materials based on load design.
  • Roof Sheeting
    Roofing sheets are installed with proper slope and sealing methods to prevent leaks and overheating.
  • Ventilation and Skylight Systems
    Ventilators, ridge vents, and translucent panels are added for airflow and daylighting.
Bước 4: Thi công mái và vách

Step 5: Floor Slab Construction

The floor must support operational loads and resist wear:

  • Base Layer Compaction
    Crushed stone is compacted to a specified thickness to form a stable sub-base.
  • Concrete Slab Pouring
    Concrete is poured in divided bays to control shrinkage and ensure quality.
  • Surface Finishing
    Power trowels are used to achieve a smooth and durable surface finish.
Bước 5: Thi công nền nhà xưởng

Step 6: Installation of MEP Systems (Mechanical, Electrical, Plumbing)

Critical for operational efficiency and safety:

  • Electrical Systems
    Install lighting, power outlets, grounding, and lightning protection as per electrical codes.
  • Plumbing Systems
    Install water supply lines, drainage for rainwater, and wastewater.
  • Fire Protection Systems
    Install fire alarms, sprinkler systems, extinguishers, and hydrants in compliance with fire safety regulations.
  • HVAC Systems
    Install mechanical ventilation and air-conditioning systems to ensure thermal comfort and air quality.
  • Specialized Systems
    Install compressed air, steam, or wastewater treatment systems depending on industry requirements.
Bước 6: Thi công hệ thống kỹ thuật

Step 7: Finishing and Final Acceptance

Final checks and cleanup before handover:

  • Site Cleaning
    Thorough cleaning and removal of construction debris.
  • Internal Inspection
    Inspect all items against the design and standards before official acceptance.
  • Project Handover
    Submit complete legal documentation, as-built drawings, material quality certificates, and operation manuals.
Bước 7: Hoàn thiện và nghiệm thu

Conclusion

With a team of experienced engineers, architects, and skilled workers, Thinh Phat Construction guarantees professional, reliable, and high-quality industrial factory construction services. We are committed to safety, timeline compliance, and putting our clients’ interests first.

Contact us today for a free consultation and get the best construction solution for your business!

📞 Phone: 091 1006 112
📧 Email: thinhphatconstruction255@gmail.com
🏢 Company: Thinh Phat Design & Construction Investment JSC

nhà xưởng

👉 Read more: 4 Reasons to Choose Thịnh Phát Construction for Your Factory Design and Build
👉 Learn more about: [What are the most favorable ages for building a house in 2025 according to Feng Shui?

See us more on Facebook: Facebook Thinh Phat

We’re ready to listen and deliver exactly what you need!

Mọi thông tin chi tiết vui lòng liên hệ:

TRỤ SỞ TP.HCM:

– Công ty Cổ Phần Đầu Tư Tư Vấn Thiết Kế Xây Dựng Thịnh Phát Construction

– Trụ sở chính: 256/55, TX25, khu Phố 2, P.Thạnh Xuân, Q.12, TP. Hồ Chí Minh.

– Xưởng cơ khí: 24E, TX 31, p. Thạnh Xuân, Q. 12, TP. Hồ Chí Minh.

– Xưởng nội thất: 256/55, TX25, khu phố 2, p.Thạnh Xuân, Q. 12, TP. Hồ Chí Minh.

– Hotline: 02822117112 hoặc 0911.006.112

– Web: thinhphatconstruction.vn

– Facebook: Thịnh Phát Construction

– Youtube: Xây dựng Thịnh Phát

– Gmail: thinhphatconstruction255@gmail.com

CHI NHÁNH HÀ NỘI:

– Địa chỉ: Tầng 4 Tòa nhà Ocean Park số 1 Đào Duy Anh, P. Kim Liên, Hà Nội.

CHI NHÁNH BÌNH DƯƠNG:

– Địa chỉ: 11H/13 KDC Lê Phong, Khu Phố Bình Phước A, Phường Bình Chuẩn, Thành Phố Thuận An, Tỉnh Bình Dương.

CHI NHÁNH BÌNH ĐỊNH:

– Chi nhánh 1: Lô LKB-D-41 Dự ans Đại Phú Gia, Khu C Khu Đô Thị - Thương mại Bắc sông Hà Thanh, Phường Nhơn Bình, Thành phố Quy Nhơn, Bình Định.

– Chi nhánh 2: Căn B1-20,21 khu đô thị Phú Mỹ Lộc, Phường Tam Quan, thị xã Hoài Nhơn, Bình Định.

– Xưởng SX : KP Cửu Lợi Bắc, phường Tam Quan Nam, thị xã Hoài Nhơn, Bình Định.

Hotline: 0911.006.112

Để lại một bình luận

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *